Category Archives: Healthcare

2-Story Modular Hospital Addition

[CHALLENGE]
A DC Veterans Hospital needed to expand its administrative space, but in order to maximize campus real estate, the 2 story modular had to be tucked into tight quarters between the existing buildings.

[SOLUTION]
Modular Genius provided 23,740 gross square feet of administrative office space, including private offices, group work stations, conference space, work flow circulation, break rooms, toilets, janitorial facilities and all adjunct facilities.

http://www.modulargenius.com
888-420-1113

VAMC 2 Story Modular Genius

Modular Family Medical Center

[CHALLENGE] 

A County Hospital had interest to expand their services to small rural community in need of local healthcare. The Hospital had the land, doctors and staff and needed a fast modular building solution.
[SOLUTION] 

Modular Genius worked with the Hospital to design and build the modular healthcare facility that met their specific needs and fit within the budget. A 2,100 Sq Ft modular building was built delivered and installed on site inclusive of all turnkey services in approx 90 days from contract to completion.

Medical Center Modular Building

[CHALLENGE] 
A Regional Hospital needed to expand their services. They were required to move these specialty doctors and staff outside of the main hospital to an adjacent site on the campus.

[SOLUTION] 
Modular Genius worked with the Hospital to design and build the modular healthcare facility that met their specific needs and fit within the budget. A 2,880 Sq Ft modular building was built delivered and installed on site in approx 60 days from contract to completion.

Medical Modular Building

[CHALLENGE]
The US Marine Corp Bureau of Medicine and Surgery (BUMED) was in need of additional administrative and storage space for vaccines. The vaccines had to be kept at a particular temperature to maintain stability of the medicine.

[SOLUTION]
Working with an 8a contractor Modular Genius provided a 3,600 sq ft modular building along with prefabricated ramps and ADA prefabricated aluminum steps. The project was completed in 60 days from notice to proceed.

Medical Transitional Modular Swing Space

Modular Genius completed a project for Ft. Meade which required an eleven unit Modular complex to be built for temperary medical and administrative space. Below was the main challenge, and the solution! To see more check out the press release or full case study on our main website, www.modulargenius.com !!!!

[CHALLENGE]
The United States Army was in need of renovating the Hospital located at one of their facilities at FT Meade, MD. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations.

[SOLUTION]
Modular Genius built this customer a 10,000 sq ft building. The temporary swing space was a fully functional medical facility with administrative space. The installation was complete in 90 days from award to occupancy.