Prefabricated Mental Health Clinic

[CHALLENGE]
A government facility needed to expand an existing modular medical complex. A small vacant corner of the property was perfect to fit in a new modular building.

[SOLUTION]
Modular Genius provided an additional 60’ x 82’ modular building to match the existing complex on the property. The modular building houses over 15 offices, restrooms, break rooms, conference rooms and storage. The project was completed in the required 120 days.

Visit http://www.modulargenius.com for more information.
888-420-1113

20150520_0653177

 

Prefabricated District Judges Office

[CHALLENGE]
A local PA government had outgrown their previous courthouse. Needing more conference rooms, holding areas, and security the County chose to purchase a modular building for the task.

[SOLUTION]
Modular Genius provided a 3,500 sqft modular building that includes conference rooms for both the defense and the prosecution, detention benches, and ballistic glass for the clerks. A glass and masonry vestibule was added to the main entrance for access and aesthetics.

Visit http://www.modulargenius.com for more information.
888-420-1113

edit 1

Temporary Fire House

[CHALLENGE]
Part of a multi-million dollar development throughout Washington DC, a temporary fire station was needed for up to 5 years. Minimal interference was necessary for traffic and surrounding businesses.

[SOLUTION]
Modular Genius provided a two-story 7,300 sqft temporary fire house with many work areas. A fire pole and equipment storage lockers were moved and reused from an existing station. A kitchen, bunks, fitness room, and locker room provide comforts, while the roll up doors allow room for 3 engines.

Learn more about this Project of the Month at www.modulargenius.com

DSC_1388-2

2-Story Modular Hospital Addition

[CHALLENGE]
A DC Veterans Hospital needed to expand its administrative space, but in order to maximize campus real estate, the 2 story modular had to be tucked into tight quarters between the existing buildings.

[SOLUTION]
Modular Genius provided 23,740 gross square feet of administrative office space, including private offices, group work stations, conference space, work flow circulation, break rooms, toilets, janitorial facilities and all adjunct facilities.

http://www.modulargenius.com
888-420-1113

VAMC 2 Story Modular Genius

Dept. of Public Works Modular Office

[CHALLENGE]
A County Government in Maryland required approximately 2000 sqft of office space within a landfill site. A 25 year life expectancy and the ability to relocate in the future was a high priority.

[SOLUTION]
Modular Genius designed and installed a 2,272 sqft gabled modular office building. Steel siding along with a traditional shingled roof provided durability as well as a visually pleasing modular structure.

Call Modular Genius for your next modular office project
888-420-1113
http://www.modulargenius.com

20140116_111850ps

VA IN – Temorary Modular Office Units

[CHALLENGE]
A Government medical facility providing both inpatient and outpatient care and services had a shortage of administrative office work space.

[SOLUTION]
Modular Genius provided by lease 3 new fully furnished temporary office units, with approximate measurements of 60’ X 36’. The buildings included 5 private offices and 2 bathrooms each, wooden steps and ramps, and an open cubicle area. The installation was completed in less than 30 days.

http://www.modulargenius.com
888-420-1113

IMG_20130823_155419_970

BCR – Temporary Modular Bunk House

[CHALLENGE]
A County Government agency was in need of a temporary modular building for their fire department as a bunk house. They needed an the space to be attached to a fabricate structure that housed vehicles.

[SOLUTION]
Modular Genius installed a 2,160 sq ft modular building for the customer. The modular space was delivered and installed in approx. 120 days. 

Image

VA DPW – Modular Office Space

[CHALLENGE]
A city government agency was in need of a permanent modular building for their public works department. They needed an new office space in a short period of time.

[SOLUTION]
Modular Genius installed a 2,160 sq ft modular building for the customer. The modular space included several employee offices, a data room, conference room and kitchenette.

vab 003

Job Site Security Trailer

[CHALLENGE]
A Prime Contractor working for the US Army Corp of Engineers was instructed to provide a security trailer at the job site trailer compound.

[SOLUTION]
Modular Genius built this customer a 2,160 square foot security trailer. The design was a 36’ X 36’ building. The project was completed in 90 days from design to occupancy.

IMG_20131211_160821_993