Category Archives: Education

Education Renovation Modular Swing Space

[CHALLENGE]
In order to efficiently complete the phased renovation required for a county school, a large modular classroom swing space building was required.

[SOLUTION]
Modular Genius constructed a 13,056 square foot modular classroom complex for the project. The size of the modular building required a fire wall be installed for life safety. The project was complete in 150 days from award to occupancy

Modular Counseling Center Building

[CHALLENGE]
A county school was in need of new counseling center for at risk children. The project was design to be a modular building for easy of design and expedited delivery.

[SOLUTION]
Modular Genius constructed a 2,160 square foot modular classroom complex for the project. Modular Genius provided the customer engineering, foundations, decks, ramps, mechanical, plumbing, electric and communication connections. The project was complete in 120 days from award to occupancy.

Modular Classroom Complex

[CHALLENGE]
A county school district was renovating a school. The decision to move part of the school out into modular classrooms to expedite the renovation was made.

[SOLUTION]
Modular Genius. Modular Genius provided a 10,296 sq ft modular classroom complex. The building had (12) classrooms, a central corridor down the center and boys and girls restrooms.

Modular Training Center

[CHALLENGE]
A Task Order Contractor working at an US Army Base needed to construct a modular training center for their customer.

[SOLUTION] 
Modular Genius built this customer a 980 square foot modular training center. The design was a 14’ X 70’ building. The project was completed in 60 days from award to occupancy.

Image

Modular Classroom Complex

[CHALLENGE]
In order to efficiently complete the phased renovation required for an elementary school and the construction of a new middle school, a large modular classroom building was required. The site was tight with little lay down area for the construction and assemble of the modular school.

[SOLUTION]
Modular Genius constructed a 13,056 square foot modular classroom complex for the project. The size of the modular building required a fire wall be installed for life safety. The turn key services provided by Modular Genius for the project included engineering, permitting, foundations, mechanical, plumbing, electric and communication connections. The project was complete in 150 days from award to occupancy.

Swing Space Modular Classrooms

[CHALLENGE]
A county school was in need of renovating one of the oldest buildings in the system. This required a phased approach to move rooms out into Swing Space Modular Classrooms.

[SOLUTION]
Modular Genius constructed a 16,184 square foot modular classroom complex for the project. Modular Genius provided the customer engineering, foundations, decks, ramps, mechanical, plumbing, electric and communication connections. The project was complete in 90 days from award to occupancy.

Portable Classroom Trailer – Assembly

CHALLENGE]
A growing church was in need of additional Sunday School Classroom space. The tight budget required them to consider all options. A temporary portable classroom trailer was selected as the solution.

[SOLUTION]
Modular Genius designed and built a 1,440 sq ft relocateable classroom. It had a central hallway which branch off to 2 large rooms. The large rooms could me divided even further with an accordion wall. Prefabricated Steps and Ramps were used to gain access.

Learning Cottage

 

[CHALLENGE]

A Public School had a fire in one of their portable classrooms. The insurance adjuster settled the claim quickly and the school had to find a replacement fast.

[SOLUTION]

Modular Genius provided a 864 sq ft new in stock modular classroom to the school district. The learning cottage was elivered and installed in 14 days from award to occupancy.

 

New Modular Training Center

[CHALLENGE]

A power company had to relocate their existing power pole training offices and classrooms. They needed to move out and be up and operational in a short period of time for a seamless transition.

[SOLUTION]

Modular Genius installed a 2,880 sq ft modular training center for their new facility. The fabrication and installation was complete in 60 days from award, inclusive of prefabricated aluminum decks and ramps and accordion walls inside the training rooms.