Author Archives: modulargenius

Modular Green Education Center

[Challenge]
The Parks and People Foundation in Baltimore, MD needed a flexible educational space for workshops, training programs, and community activities that further their non-profit mission. The modular building had to be designed for transportation from exhibition at the USGBC’s Greenbuild conference in DC as a demonstration building, before being permanently sited on the non-profit’s 9-acre urban campus in a Baltimore City park.

[Solution]
Modular Genius provided a custom 14’ x 43’ Green Education Center to allow guests to learn more about the installed products and systems, many of which were donated by sponsors. The modular structure’s massing and exterior complement to the new headquarters while providing a contemporary counterpoint to a historic Stone House and Carriage House, all located on the restored site.

Visit http://www.modulargenius.com for more information on modular construction!

Advertisements

Permanent Modular School Addition

[CHALLENGE]
In a rapidly developing area, Montgomery County Public Schools in Maryland needed replace old modular units currently on site in order to improving the learning environment for students and staff. A permanent, cost & time saving solution was required.

[SOLUTION]
After a rigorous interview process, Modular Genius was selected to build two (2) eight (8) classroom modular buildings (each approximately 9,500 sqft) at the Summit Hall Elementary School site. Site installed Nichia siding exterior matched the existing school perfectly, and the Q-Tech Bard HVAC units are highly efficient with low noise perfect for classroom settings.

Contact Modular Genius for more information!

WV Interim Modular Campus

Students and faculty in West Virginia are settling into an interim modular campus after flooding last year destroyed multiple schools in the state. Modular Genius provided 73 units including a kitchen and band room to aid in the rebuilding efforts.

Contact Modular Genius for more information on temporary classroom solutions!

DCIM100MEDIADJI_0225.JPG

Modular Set at Summit Hall ES

After a rigorous interview process, Modular Genius was selected to install two (2) eight (8) classroom modular buildings (each approximately 9,500 square foot) at the Summit Hall Elementary School site. These new modular classroom complexes will replace older units currently on the site, greatly improving the learning environment for students and staff.

The first of these units have been set, and we are excited to complete the new complex before the start of school!

Contact us for your modular classroom needs!
888-420-1113

Railroad Restroom Modular Building

[CHALLENGE]
A railroad was in need of upgrading the restroom facilities for its workers. The building had to be durable, fit on a small part of the property and installed quickly.
 
[SOLUTION]
Modular Genius built a new 700 Sq Ft modular restroom modular building for the client. The floors and walls were installed with a durable surface for high traffic. Modular Genius provided a installation in 90 days from notice to proceed to occupancy.
Contact us today for more information at http://www.modulargenius.com

Railroad Locker Room Trailer

[CHALLENGE]
A railroad was in need of upgrading the locker room facilities for its workers. The building had to be durable, fit on a small part of the property and installed quickly.

[SOLUTION]
Modular Genius built a new 480 Sq Ft modular locker room building for the client. The floors were installed with durable vinyl tile to insure the surface could be cleaned regularly and would not wear out with traffic. Lockers were installed for the workers. Modular Genius installed the building within 60 days from award to occupancy.

Contact us today for your modular building needs
www.modulargenius.com

img_0738

Relocatable Mineral Sands Laboratory

[CHALLENGE]
When complete this Relocatable Modular Mineral Sands facility will process 232t/h of heavy minerals sands feed from the existing tailing deposit and produce a concentrate of zircon and ilmenite. Modular Genius was brought into the project to assist in the design of the labs and install the modules.

[SOLUTION]
The Mineral Sands site is located in a remote part of Florida. Considering the specialized equipment (dust collector and AAON RTU) used in the buildings, construction in such a remote area would have significantly increased the cost of construction on site. Utilizing modular buildings enabled the owner to deploy their resources in a fragment of the time of conventional construction and also reduced the overall cost.

Contact us today for more information!
http://www.modulargenius.com

tp-exterior