[CHALLENGE]
A industrial manufacturing facility was in need of additional office space to be located within their compound. A variety of spaces were needed inside the building including a breakroom and conference room.
[SOLUTION]
Modular Genius designed and built the modular office space using durable materials that could withstand the test of time in an industrial environment. The project was constructed delivered and installed in 120 days from contract to completion.
http://www.modulargenius.com
888-420-1113