[CHALLENGE]
The US Department of the Interior had a requirement to install a field office at a remote location in the desert. The building required durable exterior and interior to weather the harsh conditions.

[SOLUTION]
Modular Genius provided a 2,160 sqft modular field office facility. This modular building was installed with prefabricated aluminum steps and ramps. The project was completed in 90 days from notice to proceed.

View this Case Study and others HERE, and visit www.modulargenius.com for a quote.