[CHALLENGE]
The United States Army was in need of renovating the Hospital located at one of their facilities at Ft. Meade, MD. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations.
[SOLUTION]
Modular Genius built this customer a 3,600 sq ft Modular Pathology Lab Building. The temporary swing space was a fully functional medical facility with administrative space. The installation was complete in 90 days from award to occupancy.