CHALLENGE]
A growing church was in need of additional Sunday School Classroom space. The tight budget required them to consider all options. A temporary portable classroom trailer was selected as the solution.
[SOLUTION]
Modular Genius designed and built a 1,440 sq ft relocateable classroom. It had a central hallway which branch off to 2 large rooms. The large rooms could me divided even further with an accordion wall. Prefabricated Steps and Ramps were used to gain access.