[CHALLENGE]
A Task Order Contractor working at an US Air force base was is need of Temporary Pre-Fabricated Office Building to house personal during their 5 year contract. They wanted to build a modular building using GREEN materials similar to those used in the military buildings they were tasked to renovate.
[SOLUTION]
Modular Genius built this customer a 2,160 square foot modular building using the following sustainable features: Recycled Content (Insulation and Floor Covering) Lighting (Natural Lighting Skylights, LED light fixtures with occupancy sensors) Plumbing (Double flush toilets and faucets with sensors) Energy (Low E windows, White reflective roof covering).