Modular Genius completed a project for Ft. Meade which required an eleven unit Modular complex to be built for temperary medical and administrative space. Below was the main challenge, and the solution! To see more check out the press release or full case study on our main website, www.modulargenius.com !!!!

[CHALLENGE]
The United States Army was in need of renovating the Hospital located at one of their facilities at FT Meade, MD. Their plans were to relocate part of the facility to a temporary space as the hospital underwent renovations.

[SOLUTION]
Modular Genius built this customer a 10,000 sq ft building. The temporary swing space was a fully functional medical facility with administrative space. The installation was complete in 90 days from award to occupancy.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s